Evidence and Decision Contract
Use this reference for every environment-specific exposure, remediation, exception, or readiness assessment.
Evidence record
Preserve one record per distinct component, package path, asset, finding, control, verification artifact, or exception.
| Field | Record when supplied | Do not infer from |
|---|---|---|
| signal | advisory/CVE ID, scanner finding, package finding, control | a similar finding or component |
| subject | product/component, package/path, asset or asset set, deployment scope | advisory scope alone |
| state | installed/current version, configuration, presence, scanner status | recommended or fixed version |
| provenance | artifact, field/row, source class, scope, collection time | an unverified ticket summary |
| remediation | action performed, affected scope, completion time, artifact | planned or assigned work |
| ownership | confirmed owner and source | team names guessed from paths or products |
| exception | scope, rationale, compensating controls, approver, status, expiry | a request awaiting acceptance |
| requirement | control text, acceptance criteria, prior validated comment | a generic framework name |
For each record: state supported facts first, state what they establish, mark
absent or contradictory fields unknown, gate only the dependent conclusion,
and request the smallest safe discriminator. Never collapse several paths,
assets, findings, or controls into one conclusion unless the evidence proves
they share the relevant condition and remediation path.
Exposure statuses
- Exposed: environment evidence places the exact component, version, configuration, package, or asset within the documented affected condition, and no current authoritative evidence establishes remediation or an accepted exception.
- Not exposed: environment evidence establishes that the relevant subject is absent or outside the documented affected condition. Do not use this for a subject that was affected and later fixed.
- Remediated: the subject was affected or had a finding, and current authoritative evidence verifies the applicable remediation across the stated scope.
- Excepted: an accepted, in-scope, unexpired exception record covers the finding and identifies its required controls or conditions. This is not the same as remediation.
- Unknown: evidence is insufficient, stale, conflicting, or unmatched to the advisory/finding scope.
Minimum useful exposure evidence is the advisory/CVE or scanner/package finding
plus a matching environment discriminator: product/version inventory, package
manifest/path and version, asset/vulnerability record, bounded scanner output,
deployment scope, current verification artifact, or exception record. Public
affected-version facts alone require unknown for environment exposure.
Sparse scanner signal
When the only environment evidence is a scanner’s CVE signal and a Splunk
component role, the role establishes scope for investigation but not exposure.
Return unknown. Keep the scanner observation separate from public advisory
scope, and do not restate the observation as a documented affected-component
fact.
Request the installed Splunk product version and supported release branch for the named assets first. Request scanner asset or path details only when needed to match the signal to that inventory. Then compare the evidence with the current public Splunk advisory and, if affected, identify a vendor-supported fixed maintenance release on the applicable supported branch. If current advisory retrieval is unavailable, say so and do not invent affected versions, fixed versions, or citations. Never propose manual replacement of a bundled binary as the fallback remediation.
Remediation or exception plan
Group records only by an evidenced shared component, asset set, advisory/CVE, package, or supported remediation path. For each group provide:
- supported finding and affected scope;
- confirmed owner and evidence, or
ownership gap; - recommended action: supported upgrade, removal, configuration change, scanner rerun, additional evidence, or exception preparation;
- prerequisite evidence and authorization;
- expected fresh verification signal and its scope;
- product, deployment, customer-impact, rollback, and supportability caveats;
- status as
recommended,ready for authorized execution, orverified.
Do not label a plan ready merely because a public fixed version exists. If owner, current state, supportability, scope, or exception evidence is missing, produce a gap-focused plan and ask only for those fields. Do not recommend manual replacement of bundled dependencies unless current public Splunk documentation explicitly supports that remediation for the exact component.
For scanner findings that name current and compatibility library paths with
different versions, preserve and assess each path or library generation
independently. A current top-level Splunk version does not establish that every
bundled path is remediated. Record an ownership gap when no owner is supplied,
request path-level inventory and a fresh path-scoped scanner rerun, and use
vendor-supported remediation or an accepted exception rather than unsupported
manual library replacement.
Readiness decision
Use pass, fail, or unknown:
- Pass: current authoritative evidence meets the supplied control or acceptance criteria across its stated scope, either through verified remediation or an accepted exception that the criteria permit.
- Fail: current authoritative evidence proves that a supplied requirement is unmet, remediation verification failed, or a required exception is not accepted/current.
- Unknown: the control, scope, evidence freshness/authority, remediation proof, exception status, or other decisive field is missing or conflicting.
Authoritative verification can include a current scanner result, authorized live read-only product evidence, current asset/vulnerability records, package inventory, or accepted exception documentation. Ticket state, planned work, recommended fixed versions, and stale scans are context, not completion proof.
When asked for an NFI-style or other reviewer-ready comment and supplied the relevant materials, use:
- Decision and scope: pass, fail, or unknown; finding/control and assets.
- Facts: supported observations with artifact, field, and timestamp.
- Assumptions: none, or each explicit assumption.
- Rationale: how current evidence does or does not meet the requirement.
- Gaps: only decision-blocking missing or conflicting evidence.
- Follow-up: smallest safe artifact and expected verification signal.
If the control, current authoritative verification, remediation evidence, prior
validated-control comment when applicable, or exception approval is absent,
preserve all other facts and return unknown for readiness.
Bounded report shape
Lead with findings. A compact assessment may use:
| Subject | Supported facts | Evidence | Unknowns | Exposure/readiness | Next bounded action |
|---|
Keep public advisory/product facts in a separate section from environment observations. Name an owner or route only for execution, advisory-only lookup, rollout enforcement, exception approval, ticket mutation, or certification outside this skill.