Skip to main content
Reference vendor/splunk 8 min read

readiness-contract

Upgrade Readiness Contract

Use this reference for environment evidence, capability-specific decision rules, and the report shape. Keep documentation facts and deployment observations separate.

Evidence ledger

Record one row per component or decision object. Preserve every supplied field, even when another required field is absent.

ObjectMinimum useful fieldsProvenanceSupported conclusionMissing fields
Upgrade scopeproduct/service, current version, target version, deployment type, topologyuser-provided or document-backedapplicability envelopeunresolved fields
Platformoperating system, architecture, filesystem, capacity/privilege evidenceuser-provideddocumented prerequisite comparisondecisive missing fields
Premium productname, current version, planned version, matrix evidenceuser-provided plus public sourcecompatibility result for exact combinationmissing versions/evidence
App/add-onname, version, owner, lifecycle source, Splunkbase/AppInspect resultuser-provided or supplied artifactapp-specific status if evidencedinventory or result gap
Forwarder/componentrole, current version, target relationship, documented compatibilityuser-provided plus public sourcesupported relationship if exactmissing endpoint/version
Health/prechecktarget/component, timestamp, result, applicable threshold/sourcesupplied artifactobserved pass/fail only for that checkstale or absent fields
Backupdata class, scope, timestamp, status, storage boundarysupplied artifactbackup observationrestore validation
Restore testdata class, target, timestamp, outcome, acceptance signalsupplied artifactrecovery evidence for tested scopeuntested classes
Baseline/validationmetric or function, time window, expected range, postcheck resultsupplied artifactcomparison for that signalbaseline or postcheck
Change controlwindow, freeze, approval, owner, dependency handoffuser-provided or supplied artifactreadiness of that prerequisitemissing owner/approval

Use document-backed only for what a cited public source establishes. Use user-provided for deployment facts and artifacts, even when they agree with documentation. Use unresolved for absent or conflicting fields.

Capability decision rules

Scope intake

Output known current state, target state, topology, dependencies, constraints, and missing inputs. If product/service, target release, or topology needed for sequencing is missing, stop exact-path advice and request only those fields or an authorized read-only inventory.

Documented path

Bind every path, prerequisite, release note, system requirement, compatibility claim, backup action, topology sequence, and postcheck to a current public page for the specified product and release. A source can establish a documented expectation; it cannot prove the environment is ready.

Dependency compatibility

Group results under:

  1. platform and infrastructure;
  2. topology and Splunk platform components;
  3. premium products;
  4. apps and add-ons;
  5. forwarders; and
  6. other deployment dependencies.

For every row use compatible, blocked, or unresolved, followed by the exact evidence. Use compatible only when a current applicable source or supplied authoritative result establishes the exact combination. Missing app inventory limits app readiness; it does not erase platform or premium-product findings.

For a renewed attempt after a regression in which an app or add-on is a suspected dependency, apply one mandatory regression-retry protocol before recommending rollout. Bind the exact current and proposed component, app/add-on, and configuration combinations to current lifecycle and migration guidance; when that guidance identifies breaking changes, require its migration steps and non-production test (for example, the Splunk Add-on for Microsoft Windows listing flags a breaking 5.0.0 transition). Then return a staged validation matrix that changes only one dependency dimension per stage and uses only combinations that applicable documentation supports. For every stage state the cohort and exact combination, baseline, postcheck, observable success threshold, soak period, evidence source, accountable owner, stop condition, and recovery action. Keep renewed rollout decision-blocked until each proposed combination has compatibility evidence and every completed stage meets its threshold; treat the suspected dependency as a hypothesis, not an established root cause.

Execution readiness

Order the plan as:

  1. confirm scope and target-release path;
  2. close prerequisite and compatibility blockers;
  3. capture current health and functional baselines;
  4. verify configuration, indexed-data, and KV-store protection as applicable;
  5. verify restore/recovery evidence and rollback boundary;
  6. confirm topology-specific sequence and stop conditions;
  7. confirm maintenance window, freeze, approvals, owners, communications, and dependency handoffs;
  8. state explicit go/no-go criteria; and
  9. define post-upgrade validation and escalation thresholds.

Return go only when every mandatory documented prerequisite and local criterion has current supporting evidence. Return no-go for an evidenced blocker. Return decision-blocked when decisive evidence is absent or conflicting. Missing health, backup, owner, approval, or window evidence must produce a template and evidence request, not a readiness assertion.

For a mixed or hybrid plan, decompose the work into named lanes before ordering it. Give each product, deployment type, topology, or accountable owner its own applicability boundary, prerequisites, documented sequence, evidence, stop condition, and recovery posture. Then state the cross-lane gates explicitly: which prerequisite or compatibility result unlocks the next lane, where an owner handoff or approval occurs, which baseline and recovery evidence must be shared, and what blocks the combined plan. Do not collapse unlike Enterprise, Cloud, cluster, standalone, or separately owned work into one generic timeline; keep the result planning-only and require separate authorization for execution.

Rollback and recovery

Report three separate questions:

  • Does applicable documentation support in-place rollback?
  • Which configuration, indexed-data, and KV-store protections are relevant and evidenced?
  • Which restore procedures have actually been validated for this scope?

Never turn backup existence into restore proof or a recovery plan into a supported in-place rollback promise. Without applicable backup and restore evidence, use recovery readiness unconfirmed.

Post-upgrade validation

Define the baseline, postcheck, success threshold, evidence source, and owner only when a handoff is required for each applicable check:

  • installed/running version and expected component availability;
  • documented health checks;
  • ingestion rate and continuity;
  • search participation and representative functional searches;
  • licensing state;
  • premium-product and app smoke checks;
  • resource utilization; and
  • indexer/search-head cluster communications when applicable.

Separate documented procedures from telemetry-dependent results. Without both baseline and post-upgrade observation, keep the comparison unresolved and do not diagnose a regression.

For a reported forwarder regression after an upgrade, keep the response in validation-planning scope. Preserve supplied pre- and post-upgrade observations by forwarder cohort, role, version, operating system, deployment owner, and receiver or indexer relationship. Return a comparison matrix with the exact baseline and postcheck window, ingestion continuity or lag signal, expected threshold, evidence source, accountable owner, and result for each affected and control cohort. Separate forwarder-side connectivity and queue evidence from receiver/indexer ingestion evidence so an aggregate drop is not treated as a proven forwarder root cause.

If the evidence does not isolate the changed cohort or dependency, keep the regression conclusion decision-blocked and request only the missing cohort, version, time-window, and matching baseline/postcheck fields. Define a staged validation plan that changes one supported dependency dimension at a time, holds an unaffected cohort as the control, stops expansion on a failed threshold, and states the prior supported combination or recovery handoff. Do not restart, redeploy, roll back, or recommend fleet-wide rollout from this skill. Route active diagnosis or authorized remediation to the owning operations workflow while retaining the bounded evidence and validation plan.

Smallest safe evidence route

Ask only for artifacts that can change the pending decision: a sanitized product/version/topology inventory; named app and version list; exact public compatibility record or supplied AppInspect result; bounded health/precheck output with timestamp; backup scope/status and restore-test result; baseline and matching postcheck; or maintenance window, freeze, approval, owner, and dependency status.

Prefer sanitized summaries, relevant rows, counts, and status fields. Do not request credentials, tokens, raw configurations, unbounded logs, broad customer inventories, or private Support material. If read-only discovery is explicitly authorized and available, bind it to an exact target and collect only the fields above; otherwise ask the administrator to supply them.

Mandatory coverage-first response protocol

Write the final answer in two passes. In the first pass, before optional explanation, give every capability the request needs one compact, complete result using the applicable item below. Do not begin the second pass until all applicable first-pass items exist.

  • Decision and limits: go, no-go, decision-blocked, or a narrower conclusion, including that execution is outside this skill.
  • Scope: known current and target state, topology, dependencies and constraints with provenance, followed by unresolved fields.
  • Documented path: exact-product/release requirements and point-of-use public citations, or the ambiguity that prevents exact advice.
  • Compatibility: platform, topology, premium product, app/add-on, forwarder, and infrastructure rows, each compatible, blocked, or unresolved with its evidence.
  • Execution readiness: ordered prechecks, backup/baseline prerequisites, evidenced sequence or topology gap, owners/window gaps, stop conditions, and explicit go/no-go criteria.
  • Rollback/recovery: in-place rollback support, backup coverage, and actual restore evidence as three separate conclusions.
  • Validation: baseline, postcheck, success threshold, evidence source, and required owner for each applicable validation category.
  • Next evidence or route: the smallest decision-changing inputs and only the boundary handoffs actually required.

In the second pass, add detail only where it changes a decision, supplies a requested checklist or template, or explains a cited requirement. Never defer an applicable first-pass item until after research narration, background, or optional detail. If response space is constrained, return the complete first pass and omit the second pass.

Hard concise final-answer budget

Start the final answer as soon as the minimum applicable public sources are verified. Do not spend answer space narrating research, restating the request, showing scratch work, or previewing the answer. The final answer has a hard ceiling of 700 words: use at most 450 words for one requested capability and use the remaining allowance only when the request spans multiple capabilities.

Allocate that ceiling in this order, completing each applicable item before optional detail:

  1. State the decisive action or conclusion, its evidence boundary, and the planning-only/no-execution limit.
  2. Give every requested capability its compact first-pass result. For a documented-path question, this result must preserve the direct-versus- intermediate path, each required intermediate release or alternative, the first prerequisite areas, target-release README/release-notes and system- requirements sources, compatibility sources, and the distinction between a documented path and local readiness. For a compatibility request, preserve all six dependency groups. For a multi-capability readiness request, use one dense line or row per required result rather than dropping a capability.
  3. Put one necessary public citation beside each decisive documented claim; reuse a citation for adjacent claims it supports and omit duplicative source lists.
  4. End with only the smallest safe evidence request or boundary route that can change the decision.

Omit background, repeated caveats, examples, and a recap before shortening any required path step, dependency group, capability result, evidence label, safe route, or citation. Never exceed the ceiling in order to add optional detail.