Issues
Project conventions
Resolve the issue facts in the project contract: the authoritative tracker (local files or an external service), stable IDs, labels, dependency representation, lifecycle states and transitions, ownership, review dossier location, and link and index rules. Dreamwork prescribes no ID scheme, folder layout or tracker.
Use an external tracker only through available tools and authorised access. Plan approval grants no remote write authority; if a required transition needs it, settle that during planning rather than silently switching to local files.
Record the resolved mapping per issue in the plan: stable ID, source path or locator, current state, dependencies, permitted transitions and how to apply them, review dossier destination, and a safe path key for artifact paths.
Selection
Resolve explicit IDs, label selectors, a grouping document or a fresh prompt.
Grouping documents (epics and waves)
Some projects group issues into epics with ordered waves (see the project contract). When the request names an epic and wave, the wave’s issue list is the selection and one run delivers exactly that wave:
- Read the epic and wave from the project’s grouping document; never infer membership from labels or numbering.
- Order inside the wave comes from each issue’s dependencies, not its position in the list.
- Issues the document marks as apart must not run at the same time; record them as an ordering constraint in the plan.
- An issue that depends on an unfinished issue in a later wave, or outside the epic, is a missing prerequisite: propose it before approval as for any selection.
- Moving an issue between waves after approval is a Tier C change.
- At landing, update the grouping document’s checklist as the project prescribes.
Other selectors
Several labels mean their intersection unless the human asks for a union. Show the resolved list before approval; summarise already-completed matches separately. An explicitly selected completed issue needs new scope, not automatic reimplementation.
Order by the dependency graph, not by ID. Propose unfinished prerequisites outside the selection and show the expansion. Missing IDs, cycles, conflicting entry rules and unverified “done” prerequisites block approval. For audits these are findings to report, not prerequisites to fix.
Fresh prompts produce draft issues following project conventions, committed in the proposal. Flag issues too broad for one review cycle (many files, several security or recovery boundaries) and propose a split with staged acceptance.
Issue IDs, order and plans freeze at approval. Later label edits never expand a run. Adding or dropping issues mid-run is Tier C (autonomy): the affected issue parks while independent issues continue.
Lifecycle
- Proposal commit: drafts in the project’s pending state.
- Approval commit: selected issues move to the project’s active state.
- Landing bookkeeping commit: landed issues move to the completed state; review dossiers move to the project location with every round, response, council receipt and UAT decision preserved; indexes and links are updated.
- Parked or UAT-rejected issues keep their active state, with the reason recorded in run records. Move them back only if the human says so.
Completion requires independent review acceptance, final council acceptance, run verification, explicit UAT approval and landing on the captured branch. The Architect applies transitions; children never change issue state.
Follow project link conventions. Avoid links that break when files move between lifecycle locations.